When Do You List?
Give us the address and a rough listing date, and we plan this job around it.
The job, from a seller's side
The fireplace is often the focal point of listing photos, and a face of painted brick or chipped tile dates the whole room. A remodel before listing can change that. We plan the surround, hearth and mantel with you, check that the firebox behind them is sound and keep clearances to wood trim. You get a written scope and price, and we plan the work around your listing calendar so photos come after the dust settles.
Deciding how much fireplace a sale is worth
A remodel before listing has to pay for itself, so the first question is not which tile looks nicest but what the buyers for this house expect. In Costa Mesa that varies street by street. A modest ranch house aimed at first-time buyers needs a fireplace that is clean, safe and not ugly; a full rebuild of the face is rarely returned in the price. A remodeled house in Newport Beach with new floors and a new kitchen looks unfinished if the fireplace still has 1970s brick and a brass screen, and buyers there notice. We start by asking how the house is being priced and staged, then lay out options from light to heavy. Light work means cleaning, painting or limewashing the brick, a new screen or doors and a refreshed hearth. Middle work means refacing the surround in tile, thin stone or smooth plaster and adding a simple mantel. Heavy work means changing what burns in the box, such as adding a gas insert, which changes the use of the fireplace and the paperwork with it.
Every option has to clear the same rules underneath the finish. Combustible material, such as a wood mantel or trim, needs a set distance from the opening, which grows as the trim sticks out farther. The hearth in front has to extend far enough to catch a rolling log or a spark, and it has to be built from noncombustible material. Many older fireplaces were built before those numbers were enforced, so a remodel that keeps the old mantel in the old spot can carry a problem forward into the buyer's report. We measure first, tell you what the current layout allows, and design the new face within it. That way the remodel answers an inspector's question rather than creating one. When the firebox itself is cracked or the panels in a metal unit have failed, the remodel fixes that first, since a beautiful surround around a damaged box is the kind of thing a buyer's inspector writes up.
Planning a remodel around the listing calendar
A fireplace remodel touches more trades than most sellers expect: masonry or framing, tile or plaster, sometimes gas, sometimes paint on the wall around it. We plan the work in the order that keeps dust and wet trades away from finished surfaces, and we tell you plainly how long each part takes, including the time mortar, thinset or plaster needs to cure before a fire or a stager's props go near it. If the listing date cannot move, we will tell you which version of the remodel fits the time you have and which would have to wait. A lighter refresh done well looks better in photos than a heavier remodel rushed. Where a gas insert or a direct vent unit is part of the plan, our published figures help with the budget: a gas insert set into the existing firebox is $2,950 to $5,950 installed, and a direct vent fireplace built into a wall that has no chimney is $4,750 to $9,550.
Many houses in Costa Mesa and Santa Ana have plain brick fireplaces that look heavy next to updated rooms, and sellers there often choose a smooth plaster or tile face with a slim mantel, which reads modern in photos at a fraction of a full rebuild. In Laguna Hills, newer tract homes often have a metal fireplace with a tile face that can be replaced without touching the firebox, as long as the unit's listed clearances are kept. The remodel ends with a short record of what was built, the materials used and the clearances measured, which goes into the disclosure folder and answers the inspector's questions before they come up. If the fireplace also needs a chimney inspection or repair, both can be planned in the same set of visits. Use the contact page to describe the fireplace as it is now, the look you are after and the date your agent hopes to list.
How Boyce Chimney Sweep handles a pre-listing job
Inspect First
We see what a buyer would see before naming a repair
Sorted Findings
Each item marked fix, disclose or leave
Prices on Paper
A written scope reaches you before any work
Escrow Paperwork
Photos and a repair note you can forward
Where we offer fireplace remodel
Search for the city you are selling in. Several have a local page for this job, covering the housing there and what buyers tend to raise.
CA
Fireplace Remodel in Costa Mesa
Listing in Mesa Verde or on the Eastside? This city's housing is 68% pre-1980, so the chimney is often original. Our Level 2 report arrives before your list date, and you choose: repair, or disclose and move on.
Open the local pageCA
Fireplace Remodel in Santa Ana
Floral Park sellers hold houses in a 1920s and 1930s revival style, and citywide 13% of homes are pre-1950. If the flue is original, book our Level 2 before photos, and escrow carries no chimney surprise.
Open the local pageCA
Fireplace Remodel in Newport Beach
Big modern hillside houses arrived with the 2002 annexation of Newport Coast, yet 55% of homes citywide are pre-1980. Whichever you are listing, our Level 2 writes up flue, firebox and crown for the disclosure packet.
Open the local pageCA
Fireplace Remodel in Laguna Hills
Moulton Ranch land filled with houses across the 1970s and 1980s, and owners occupy 70% of them. Tract home or Nellie Gail custom, we check the fireplace early so no repair request stalls your sale.
Open the local pageOther jobs sellers book
Chimney Sweep
Soot and tar cleared from the flue before listing photos and the buyer's inspector, with a note on what the brushes uncovered.
See the jobChimney Inspection
A Level 1 visual check that tells a seller, before the listing goes live, which chimney items a buyer will ask about.
See the jobChimney Repair
Cracked mortar, loose top bricks and worn caps put right before a buyer's report turns them into a credit request.
See the jobFireplace Inspection
A room-side look at firebox, hearth, damper and doors, written up the way a buyer's inspector will read them.
See the jobFireplace Repair
Firebox joints, hearth tile, damper hardware and doors repaired so the fireplace shows well in person and in photos.
See the jobChimney Level 2 Inspection
Recorded footage of the flue from bottom to top, with attic and roof checks, finished before listing so escrow holds no chimney surprises.
See the jobChimney Cap Installation
A new stainless cap fitted ahead of the listing, so roof photos and the buyer's report show a covered flue.
See the jobChimney Flashing Repair
The metal at the roof line resealed or replaced, so a ceiling stain never makes it into the seller's disclosure.
See the jobChimney Masonry Repair
Spalled brick, open joints and soft mortar repaired before listing, while you still pick the price and the timing.
See the jobChimney Rebuilds
Leaning or badly cracked stacks rebuilt from the roof line or lower, with the scope written up for escrow.
See the jobFireplace Cleaning
Ash, soot stains and stale odor cleared from the firebox and doors so the fireplace looks cared for at the open house.
See the jobGas Fireplace Cleaning
Clouded glass, dusty burners and logs out of place cleaned up so the gas fireplace lights cleanly in front of buyers.
See the jobGas Fireplace Repair
Pilots that drop, igniters that fail and dead remotes fixed before a showing, so the switch works when an agent flips it.
See the jobFireplace Inserts
A sealed gas insert added to an old open fireplace, a feature buyers notice and a fix for a drafty room.
See the jobPellet Stove Repair
Shutdowns, smoky doors and failed starts on a pellet stove traced and fixed before buyers come through.
See the jobWood Stove Repair
Worn door seals, cracked baffles and loose stovepipe repaired so a wood stove passes a buyer's inspection without comment.
See the jobGas Logs
A gas log set fitted in a working fireplace, so buyers see a fire that lights with a key or a remote.
See the jobChimney Seismic Retrofit
Older brick stacks braced, strapped or rebuilt lighter above the roof, with the plan written down for the buyer's side.
See the jobChimney Crown Repair
The cement cap on top of the brick sealed or recast before a buyer's inspector looks down from the ladder.
See the jobDryer Vent Cleaning
Lint packed in the dryer duct cleared before listing, so the laundry room passes the buyer's walk-through.
See the jobChimney Liner Installation
A stainless liner run through a cracked or unlined flue, so a damaged flue becomes a repaired line in the report.
See the jobChimney Leak Repair
Water getting in at the chimney found and stopped before a ceiling stain lands on the disclosure form.
See the jobChimney Waterproofing
A breathable repellent applied to repaired brick, so the chimney sheds rain through winter and through escrow.
See the jobChimney Damper Repair
A damper that sticks, rattles or will not seal repaired, since buyers' inspectors almost always try the handle.
See the jobChimney Chase Cover
A rusted steel lid on a framed chimney replaced with one made to measure, so orange streaks stop running down the siding.
See the job